Electrical Engineering - Industrial

Share on:

Industrial plants rely on various electrical loads to operate safely and reliably. You can rely on our team to work with you at every stage of your project, providing the support you need to be a safe, efficient and reliable operator.

Whether you need an audit, to develop a feasibility study, to optimise your concept design, to finalise your design, or require construction and commissioning support, we are here to help you address the various needs required for operating and maintaining your industrial plant.

GHD embraces a culture of safety. To help you eliminate or minimise operational risks, we build safety into every aspect of our design. We can also offer auditing services and assistance with developing safe work procedures.

Our team is available to listen and provide you with answers to address your operational or project needs. We can provide stand alone services or be part of an integrated multi-discipline GHD project team.

Services:

To enable electrical loads to operate reliably and safely without impacting adversely on other equipment, we consider:

  • Power system fault levels and load flows
  • Equipment and cable ratings (normal and fault conditions)
  • Equipment selection and specifications
  • Harmonics and power factors
  • Neutral earthing
  • Electrical protection and grading
  • Voltage drop (normal and transient conditions)
  • Variable speed operation and reduced voltage starting
  • Insulation coordination and overvoltage protection
  • Earthing and equipotential bonding
  • Hazardous areas

For further information, contact:

Jennie Burdeniuk
Service Line Leader, Electrical Engineering (Industrial) – Australia, Chile, New Zealand, Asia Pacific, Europe and the Middle East
T: +61 8 8111 6531
E: Jennie Burdeniuk

Kevin Pickersgill
Service Line Leader, Electrical Engineering (Industrial) - North America
T: +1 519 8840510
E: Kevin Pickersgill

Cunderdin B Pump Station

image

The Water Corporation of Western Australia engaged GHD to advise on a project to improve the efficiency of the Cunderdin B Pump Station (PS B) which is part of the Goldfields and Agricultural Water Supply (GAWS) scheme.

PS B supplies water in an easterly direction along the Main Conduit (MC) from Cunderdin to Kalgoorlie. The three existing pumps in PS B can operate in parallel to achieve 77.6 ML/d. However due to surge constraints, this mode is currently not possible.

Read More . . .

HV Indoor Switchgear Life Extension Analysis

image

Commercial pressures are increasing on organisations to maximise their plant utilisation and reduce the lifetime cost of assets. At the same time, ageing switchgear presents health and safety challenges. For example, old HV switchgear was not built to withstand an internal arc fault because the standards at the time did not acknowledge this hazard.

BHPB Nickel West engaged GHD to an analyse switchgear at their Kwinana Refinery with a view to apply the learnings across the business, thus extending the life of their old HV switchgear

Read More . . .

Instrumentation & Control
Hydrocarbons processing Service Line
Materials Handling
Materials Handling
Minerals Processing
Tailings
Oil & Gas
Hydrocarbons processing Service Line
Plant Engineering
Hydrocarbons processing Service Line
Power Generation
Power Generation Thumbnail
Railways
station
Renewable Energy
Renewable Energy Thumbnail
Wastewater Collection Systems

Watsewater Systems
Wastewater Treatment

Wastewater Treatment
Water Transmission and
Distribution
Water Quality Treatment, GHD
Water Treatment & Desalination

Water Quality Treatment, GHD